Category Archives: Baggage Compartment

Matching Dials Installed, Door Sensors, Wing Root Wiring and Baggage Lights

Over the holidays I took some time off from building to spend time with family. But I was able to get a few things completed in the wiring department. I received my order of matching metal dials and found that the … Continue reading

Posted in AFS Electronic Flight Instrument System, Avionics, Baggage Compartment, Cabin Doors, Door Latches, Electrical, Electronics, Gretz Aero Pitot, Instrument Panel, Interior, Lights, Vans RV10 Project | Leave a comment

Co-Pilot Seat Heater, Exhaust Stud Re-Torquing, Brake Pipe Fittings, Rear Oxygen Outlet, and Armrest Electronics

I started the day by moving some things to the new hangar at the Aurora Airport – that’s right, we are now leasing a hangar! While the plane isn’t quite ready to head off to the airport yet, I was … Continue reading

Posted in Aerosport Products, Baggage Compartment, Brakes, Center Armrest, Control Approach Rudder Pedals, Electrical, Electronics, Engine, Exhaust, Finish Kit, Firewall Forward, Interior, Mountain High Oxygen, Oregon Aero, Seat Belt Planet, Seatbelts, Seats, Vans RV10 Project | Leave a comment

ADS-B Antenna Doubler, Tail Wire Runs, Baggage Bulkhead, Oxygen Lines and Tail Scat Tubes

I started the day by cleaning the ADS-B antenna doubler and then applying some anti-oxidant paste to the surface and clecoing it in place. I am going to have to find some help to rivet the doubler in place, so … Continue reading

Posted in ADS-B, Aerosport Products, Antennas, Baggage Compartment, Electrical, Mountain High Oxygen, Navworx, Static System, Vans RV10 Project | Leave a comment

Pilot Window, Baggage Bulkhead, Battery Port, and MH Oxygen Refill Port

Today the day was another day of small, but steady steps of getting items assembled into the fuselage. I got started with installing the pilot side window. Initial fitment showed that the window needed some additional trimming. So I used … Continue reading

Posted in Baggage Compartment, Cabin Doors, Electrical, Firewall Forward, Ground Power, Interior, Mountain High Oxygen, Vans RV10 Project, Windows | Leave a comment

Rosen Visors, Door Interiors, Heat Ducts, Interior Panels

I started the day with getting some screws I needed to mount the Rosen Visors. I am using some black alloy steel #10 screws that are 3/8″ long. I got the right visor mounted and taped up for protection. Looks … Continue reading

Posted in Access Covers and Floor Pans, Aerosport Products, Baggage Compartment, Cabin Doors, Canopy Cover, Climate Control, Control Approach Rudder Pedals, Door Latches, Door Locks, Finish Kit, Industrial Lock and Hardware, Interior, Locks, Paint, Rosen Visor, Vans RV10 Project | Leave a comment

Right Door Lock Reinforcement, Door Primer, Interior Panel Paint, Final Skin Rivets, Inspection Panel Installations, Overhead Console Outfitting, Start of Left Door

Wow, today was a day full of lots of different projects. Finishing the door interiors takes time between coats of the primer so that leaves plenty of time to get to other items needing attention. Today I started with figuring … Continue reading

Posted in Access Covers and Floor Pans, Aerosport Products, Baggage Compartment, Cabin Doors, Canopy Cover, Control Approach Rudder Pedals, Door Locks, Finish Kit, Fuselage Kit, Industrial Lock and Hardware, Interior, Paint, PlaneAround Center Latch, Primer, Step Installation, Uncategorized, Vans RV10 Project | Leave a comment

Baggage Door and Compartment Completion

Happy Halloween everyone! Tricia was nice enough to carve up a pumpkin for our new RV10 since it’s out little baby! Didn’t she do great? I was able to get the baggage area wrapped up. After disassembling the door, deburring … Continue reading

Posted in Baggage Compartment, Baggage Door, Fuselage Kit, Vans RV10 Project | Leave a comment

Baggage Area Floors, Antennas and Conduit

This update covers work over the last few days as its been piece meal work after daytime commitments. Since the baggage and rear seat floors will be going in and restrict access to the rear rib bays, some work has … Continue reading

Posted in Baggage Compartment, Fuselage Kit, Vans RV10 Project | Leave a comment

Baggage Door Frameout and Access Panels

The work in the baggage area continued with cleco’ing and drilling the parts that will frame out the baggage door opening. This includes the stiffner for the angled portion of the opening and the latch area as well. The usual … Continue reading

Posted in Baggage Compartment, Fuselage Kit, Step Installation, Vans RV10 Project | Leave a comment

Baggage Area Floors

I have been out of town for a few days working, but I got a little time today after I got back from traveling. I got the rear passenger seat pans cleco’d in and match/final drilled with the ribs. I … Continue reading

Posted in Baggage Compartment, Fuselage Kit, Vans RV10 Project | Leave a comment